MAINTENANCE
UTC --:--:--

the work is underway

The engineering crew is rebuilding the company's infrastructure: services are temporarily unavailable. We'll be back soon with an updated platform and the same spirit.

// 01 — work progress

Build in progress

working
infrastructure rebuild
stages in progress: all
release freeze: active
  • Legacy perimeter teardown in progress
  • Data migration & replication in progress
  • New application cluster in progress
  • DNS, routing, certificates in progress
  • Redundancy & disaster recovery in progress
  • Acceptance testing in progress
log ▸ maintenance window opened, services switched to read-only

// 02 — roadmap

Key milestones

  1. Stage 01
    Maintenance window opens

    Release freeze, public services stopped, data snapshots taken.

  2. Stage 02
    Data migration

    Full storage migration to the new infrastructure with per-volume checksum verification.

  3. Stage 03
    Closed testing

    Load testing and acceptance review by the in-house team.

  4. Stage 04
    Platform v2 launch

    Updated services go live. Feathers counted. Heading verified.

// 03 — what changes

Why all of this

01
Perimeter

New network architecture and segmentation. Fewer entry points and faster recovery from incidents.

02
Data

Encryption at every layer, geo-replication and verifiable backups. Nothing gets lost — not even a feather.

03
Platform

Rebuilt service core: higher throughput, lower latency, transparent visibility into the state of every node.

04
Observability

A single status board with every action logged. After launch everything will be visible, not guessed.